Content
Roadmap
2024 PI1 - Sprint 1
Start date 01/08/2024
Finish date 01/22/2024
over 2 years late
0 closed (0%) 13 open (100%)
h1. 2024 PI1 - Sprint 1
Related work packages
- ART-1 Engineering - Feature #48: Add two-factor authentication
- ART-1 Engineering - Epic #43: Prototype R1
- ART-1 Engineering - User story #55: Complete new server configuration
- ART-1 Engineering - User story #57: Migrate users
- ART-2 Design - Feature #76: Define design perimeter
- ART-2 Design - Feature #77: Conduct user research to define design goals
- ART-2 Design - Feature #78: Submit test results
- ART-2 Design - Epic #69: Define the foundations of design
- ART-2 Design - User story #82: Create customer journey map
- ART-2 Design - User story #83: Define personae
- ART-2 Design - User story #84: Define test goals and criteria
- ART-2 Design - User story #85: Recruite test participants
- ART-2 Design - User story #86: Define test method and write test guide
2024 PI1 - Sprint 2
Start date 02/05/2024
Finish date 02/19/2024
about 24 months late
0 closed (0%) 9 open (100%)
h1. 2024 PI1 - Sprint 2
Related work packages
- ART-1 Engineering - Feature #52: Persist M2 selection state persistent across sessions
- ART-1 Engineering - Feature #58: Update security protocolcs
- ART-1 Engineering - Feature #61: Accessibity check (WCAG compliance)
- ART-1 Engineering - Epic #44: Prototype R2
- ART-2 Design - Feature #79: L2 Wireframes
- ART-2 Design - Feature #80: L3 Mockups
- ART-2 Design - Feature #81: Create rough sketches (V20 spec)
- ART-2 Design - Epic #70: Design Prototype
2024 PI1 - Sprint 3
Start date 03/04/2024
Finish date 03/18/2024
about 23 months late
0 closed (0%) 2 open (100%)
h1. 2024 PI1 - Sprint 3
Related work packages
- ART-1 Engineering - Feature #49: Adapt prototype for user test
- ART-1 Engineering - Feature #59: SSO Prototype
Bugs
h1. Bugs
ART-2 Design - Design backlog
0 closed (0%) 5 open (100%)
h1. Design backlog
Related work packages
- ART-2 Design - Feature #71: Update security protocolcs
- ART-2 Design - Feature #72: SSO Prototype
- ART-2 Design - Feature #73: Integrate with Matrix client
- ART-2 Design - Feature #74: Accessibity check (WCAG compliance)
- ART-2 Design - Feature #75: Set up email servers
ART-1 Engineering - Engineering backlog
0 closed (0%) 5 open (100%)
h1. Engineering backlog
Related work packages
- ART-1 Engineering - Feature #46: Update server infrastructure
- ART-1 Engineering - Feature #60: Integrate with Matrix client
- ART-1 Engineering - Feature #62: Set up email servers
- ART-1 Engineering - User story #54: Generate configuration file
- ART-1 Engineering - User story #56: Upgrade and migrate database
New Team - Engineering backlog
0 closed (0%) 3 open (100%)
h1. Engineering backlog
Related work packages
- New Team - Feature #200: Set up email servers
- New Team - Feature #206: Update server infrastructure
- New Team - User story #212: Generate configuration file
ART-1 Engineering - Sprint X
Start date 02/10/2026
Finish date 02/17/2026
Due in 13 days
0 closed (0%) 1 open (100%)
Related work packages
- ART-1 Engineering - Feature #45: Connect System A and System B